Generator and power systems industries
Find an integrated power systems solution to meet your needs, regardless of industry.
Explore power generation products
Frequency (Hz)
60
Fuel Type
Diesel
Prime
270 kW
337-338 kVA
Standby
300 kW
375 kVA
Frequency (Hz)
60, 50
Fuel Type
Diesel
Prime
291-455 kW
364-569 kVA
Standby
320-500 kW
400-625 kVA
Frequency (Hz)
60
Fuel Type
Diesel
Prime
410-455 kW
513-569 kVA
Standby
450-500 kW
563-625 kVA
Frequency (Hz)
60
Fuel Type
Diesel
Prime
450-900 kW
563-1125 kVA
Standby
500-1000 kW
625-1250 kVA
Frequency (Hz)
50
Fuel Type
Diesel
Prime
460-500 kW
575-625 kVA
Standby
505-550 kW
631-688 kVA
Frequency (Hz)
50, 60
Fuel Type
Diesel
Prime
512-600 kW
640-750 kVA
Standby
565-660 kW
706-825 kVA
Frequency (Hz)
60
Fuel Type
Diesel
Prime
545 kW
681 kVA
Standby
600-650 kW
750-812 kVA
The equipment you use to power your job is essential to its success—and it's often one of your biggest expenses, too.
August 25, 2026
As data center power demands continue to rise, electrical engineers are under increasing pressure to design power systems that are reliable, scalable, and ready for the future.
August 24, 2026
Long after a purchase order is signed, a wide range of decisions and operating conditions influence total cost of ownership (TCO) over the life of an engine.
July 29, 2026
Technology pushes our world forward at an exponential rate.
June 30, 2026
Cummins Inc. (NYSE: CMI) today announced the expansion of its award-winning, high-horsepower generator portfolio with solutions powered by the QSK78 engine platform for 50Hz markets, delivering exceptional performance, reliability, and sustainability for data centers and mission-critical applications worldwide.
June 18, 2026
Cummins Inc. (NYSE: CMI) has been awarded the Silver award in Consulting Specifying Engineer’s (CSE) 2026 Product of the Year program for the Centum™ S17 Series generator sets (600–1000 kW, 60 Hz) in the Power category.
June 02, 2026
Introduction Fueled by the rapid rise of artificial intelligence (AI) and a shift toward high-density computing, the data center industry entered 2025 in overdrive.
May 06, 2026
Our bodies and minds don’t follow a close of business.
April 13, 2026